Breve: Watch our dynamic showcase of the Alloy Steel Spiral Wound Finned Tube with L Foot! This video demonstrates how the unique L-foot fin geometry enhances heat transfer efficiency in industrial heat exchangers. You'll see close-up views of the spiral winding process and learn how this design provides superior thermal contact and corrosion protection for demanding applications.
Caratteristiche del prodotto correlate:
Features an alloy steel core tube with helically wound L-foot fin strip for enhanced thermal contact.
L-foot fin geometry ensures tight contact with tube surface, dramatically improving heat transfer efficiency.
Spiral winding provides continuous coverage, significantly increasing external surface area compared to bare tubes.
Fins act as a protective cover for the tube wall, offering corrosion protection from the air side.
Tension-wound construction allows for thinner core tubes and minimal modification of base material.
Suitable for operating temperatures up to 230°C on the fin side in air-cooled heat exchangers.
Available in various material grades including ASTM A213 T11, T22, EN 13CrMo4-5, JIS STBA22, and GB 12Cr1MoVG.
Custom dimensions and surface-coating options available to match specific heat-exchanger requirements.
FAQ:
Will the fins remain firmly attached under thermal cycling and high-velocity air vibration?
Our L-foot finned tubes use controlled tension in the fin strip winding to ensure tight foot contact on the tube, minimizing loosening under start-stop cycling, vibration, or thermal shocks.
Is the L-foot fin the right choice compared to other fin types for my application?
Yes, if your air-side fin temperature is moderate (up to ~230°C) and you want a cost-effective solution with high surface area. For more severe duties, we can advise upgraded fin types or alternate materials.
How about corrosion resistance and maintenance for these finned tubes?
The fin serves to shield the tube wall, reducing direct exposure to ambient air and corrosion potential. Increased heat-transfer efficiency also means fewer tubes are required, reducing bundle volume and associated structure costs.
What is your delivery time for these finned tubes?
Generally 10-15 days if goods are in stock, or 30-40 days if not in stock, depending on quantity.